Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–4 dari 4 artikel
Comparative Analysis of Formwork Systems: Cost Efficiency and Time Management in Construction Projects
Advance Sustainable Science, Engineering and Technology
Vol 7
, No 2
(2025)
Formwork systems are essential for achieving efficiency and sustainability in multi-story construction. This study compares the cost and time efficiency of multiplex and aluminum formwork systems for constructing beams and slabs on the 6th to 13th floors. Field observations and a literature review were employed to gather data using a mixed-methods approach. This study adopts a mixed-methods approach, combining quantitative and qualitative methods. The findings reveal that aluminum formwork requi...
Sumber Asli
Google Scholar
DOI
1 Sitasi
Exploration of Identification at Each Phase to Advance Productivity Towards Sustainable Practices
Advance Sustainable Science, Engineering and Technology
Vol 7
, No 2
(2025)
This study analyzes the productivity of tower cranes in high-rise building construction projects in Indonesia, focusing on sustainable practices and advanced techniques. The rapid growth of infrastructure has heightened competition in the construction sector, making efficiency essential. Tower cranes are key to accelerating project timelines and reducing costs, but their productivity can differ between theoretical specifications and actual field conditions. Using a quantitative descriptive metho...
Sumber Asli
Google Scholar
DOI
The Risk Analysis of Work Accidents Using The Bowtie Method in The Ciputra Hospital Construction Project
Jurnal Teknik Sipil
Vol 17
, No 1
(2024)
The condition of work accident risk is a critical factor that needs to be taken seriously. Related to the construction of the Ciputra Hospital Project located on Jl. Made Selatan - Citraland Surabaya, the Ciputra Hospital project is planned to be built on nine floors with a building area of 23,000 m2, which will allow for various occupational accident risks. So, a risk analysis is needed to identify hazards that can occur. In this study, data collection was carried out through interviews and als...
Sumber Asli
Google Scholar
DOI
The Implementation of BIM Tekla Structure on Quantity Take Off for Structural Works of X Building Project
Jurnal Teknik Sipil
Vol 17
, No 1
(2024)
BIM technology in the construction world is growing. However, the application of BIM in Indonesia has not been carried out thoroughly. BIM technology can help quantity take off work that affects the success or failure of a project. BIM can reduce the error rate of quantity take off planning calculations compared to manual calculations. Tekla Structure is one of the software developments of BIM that can produce quantity take off building output along with 3D visualisation. This research conducts...
Sumber Asli
Google Scholar
DOI