Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–2 dari 2 artikel
Comparative Analysis of Formwork Systems: Cost Efficiency and Time Management in Construction Projects
Supriyono, Auliyah Shabirah
; Putra, I Nyoman Dita Pahang
; Bambang Trigunarsyah
Advance Sustainable Science, Engineering and Technology
Vol 7
, No 2
(2025)
Formwork systems are essential for achieving efficiency and sustainability in multi-story construction. This study compares the cost and time efficiency of multiplex and aluminum formwork systems for constructing beams and slabs on the 6th to 13th floors. Field observations and a literature review were employed to gather data using a mixed-methods approach. This study adopts a mixed-methods approach, combining quantitative and qualitative methods. The findings reveal that aluminum formwork requi...
Sumber Asli
Google Scholar
DOI
1 Sitasi
Exploration of Identification at Each Phase to Advance Productivity Towards Sustainable Practices
Putri, Azhahra Divia
; Putra, I Nyoman Dita Pahang
; Adibah Nurul Yunisya
Advance Sustainable Science, Engineering and Technology
Vol 7
, No 2
(2025)
This study analyzes the productivity of tower cranes in high-rise building construction projects in Indonesia, focusing on sustainable practices and advanced techniques. The rapid growth of infrastructure has heightened competition in the construction sector, making efficiency essential. Tower cranes are key to accelerating project timelines and reducing costs, but their productivity can differ between theoretical specifications and actual field conditions. Using a quantitative descriptive metho...
Sumber Asli
Google Scholar
DOI