Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–3 dari 3 artikel
Quantitative Modeling of Change Order Impacts on Cost and Time Overruns in Indonesian Toll Road Infrastructure Projects
Sasmito, Hadi
; Amin, Mawardi
Change Orders (COs) are a major challenge in toll road infrastructure projects, often causing cost and time overruns. This study aims to identify key CO drivers and quantify their impacts on project performance in Indonesian toll road projects. A mixed-methods approach was applied, involving qualitative interviews with 35 experts (project managers, consultants, contractors) and quantitative surveys from 75 respondents covering 20 projects implemented between 2015 and 2023. Data analysis employed...
Google Scholar
DOI
Analysis of Claims and Dispute Resolution in Construction Projects: a Case Study Approach
Ari Adi Pratama, Angga
; Amin, Mawardi
Disputes in construction projects are often inevitable due to various factors such as delays, cost overruns, and changes in scope. This study aims to identify the root causes of claims and examine the resolution strategies implemented in the Sierra Intercultural School construction project. Using a qualitative descriptive approach, data were collected through in-depth interviews with contractors, consultants, and owners, as well as analysis of supporting documents such as contracts and site repo...
Google Scholar
DOI
Optimizing Cost Performance in Green Industrial Palm Oil Projects Using AI-Based AEC
Pahlevi Wijaya, Ferry
; Amin, Mawardi
Advance Sustainable Science, Engineering and Technology (ASSET)
Vol 8
, No 1
(2026)
This study investigates green industrial palm oil project cost performance determinants through Artificial Intelligence (AI)-based Architecture, Engineering, and Construction (AEC) systems. The study employed a Structural Equation Modeling Partial Least Squares (SEM-PLS) approach to analyze significant data collected from 115 respondents through 166 validated indicators. Ten primary drivers were identified, and alternative water sources topped the list, followed by indoor air quality auditing, g...