Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–10 dari 25 artikel
Analisis Perbandingan Produktivitas Jam Kerja Pada Proyek Reparasi Kapal TB Ampenan 01 Dengan Metode Critical Path Method dan Critical Chain Project Management di Galangan Kapal Madura
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 4
, No 4
(2026)
Project scheduling is an important element for shipyard companies to gain more profit. The most frequently used analysis is the Critical Path Method (CPM). However, in reality, planning using the CPM method is considered less efficient because it does not consider the productivity of each job in it and adds safety time which causes the project duration to become longer. In accordance with the above problems, a new method for planning project schedules is now being developed, namely Critical Chai...
Sumber Asli
Google Scholar
DOI
Analisa Teknis dan Ekonomis Perawatan Terencana Kapal KM Mutiara Ferindo 5 Roro 9000 GT
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 4
, No 4
(2025)
In this case, it refers to the purpose of the content in this final assignment, namely by compiling a schedule for the Implementation of KM.Mutiara Ferindo 5 Ship Maintenance during the docking process at the PT.PAL Indonesia shipyard. Making a schedule includes what components are repaired while the ship is in the shipyard, making a schedule for managing ship maintenance that has been carried out at the shipyard. The data used in this thesis is data from PT.Antosim Lampung Pelayaran Surabaya an...
Sumber Asli
Google Scholar
DOI
Interactive Smart Book Design Based on Augmented Reality with Constructivism Approach in Introduction to Management Course
International Journal of Research in Education
Vol 5
, No 1
(2025)
In Indonesia, there are no augmented reality-based management economics textbooks yet, most of them are still ordinary printed management economics books. In the previous introductory management course book, it was still a regular printed book, there was no touch of augmented reality technology so that the product of the introductory management course was still simple, then after conducting interviews with the lecturers of the introductory management course, an interactive smartbook based on aug...
Sumber Asli
Google Scholar
DOI
Mesin Penyiram Tanaman Otomatis Berbasis Panel Surya untuk Budidaya Tanaman Kangkung di Kel. Mulyorejo, Malang
Karunia: Jurnal Hasil Pengabdian Masyarakat Indonesia
Vol 3
, No 4
(2024)
This community service activity is aimed at helping women's farmer groups in Mulyorejo Village, Malang, in developing automatic watering technology based on renewable energy for water spinach cultivation. The system developed uses solar panels as an energy source, which drives the automatic watering machine. This technology is expected to increase irrigation efficiency, reduce dependence on human labor, and increase the productivity of water spinach plants. The results of the activity show that...
Sumber Asli
Google Scholar
DOI
Optimalisasi Passage Planning Pada Electronic Chart Display and Information System Guna Meningkatkan Keselamatan Pelayaran: Studi Kasus Psv Anggrek 601
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 3
, No 1
(2024)
Before carrying out sailing activities as a navigator on a ship, the thing you must prepare is, prepare everything related to the cruise plan. This aims to minimize the occurrence of accidents on ships when sailing. Making passage plans is usually made using paper maps, but this is a long and inefficient method to do. So, with current technological advances, several systems and tools have been created to make it easier to create passage plans, namely digital maps or better known as Electronic Ch...
Sumber Asli
Google Scholar
DOI
Prospective Teachers‘ Barriers during Microteaching Course
Scripta : English Department Journal
Vol 10
, No 2
(2023)
Microteaching is one of the methods for mastering teaching skills in a teaching institution. In conducting microteaching, teachers and students may experience difficulties or barriers. Barriers that will be discussed in this discussion are those prospective teachers with less teaching experience may encounter. This study aims to know about the barriers or problems faced by the students in the seventh semester of the English Education Study Program of IAIN Palangka Raya in conducting a micr...
Sumber Asli
Google Scholar
DOI
PENGARUH VISKOSITAS BBM, JARAK DAN KECEPATAN PEMOMPAAN TERHADAP PERFORMA TEKANAN HIDROLIK INJEKTOR MESIN DIESEL
Teknika
Vol 8
, No 2
(2023)
ABSTRACT
Euro-4 emission standards for motor vehicles or those implementing a fuel injection system. The quality of the injector can only be determined with a Nozzle tester. The main problem is that the pressure data from the test results on the nozzle tester before and after the service is used as a reference for the suitability of the fuel misting quality in the engine manual. The aim of this research is to determine the minimum and maximum pressure performance of diesel injectors. The...
Sumber Asli
Google Scholar
DOI
Analisis Perbandingan Produktivitas Jam Kerja pada Proyek Reparasi Kapal TB. Ampenan 01 dengan Metode Critical Path Method & Critical Chain Project Management di Galangan Kapal Madura
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 2
, No 4
(2023)
This final assignment compared the results of durations in the CCPM method and the Critical Path Method (CPM) by conducting a case study of ship repairs at Galangan Kapal Madura Ltd. Initial project scheduling employed the traditional method of a Gantt chart, which was then broken down in more detail and complete relationships among activities into CPM form. The results were then compared with the duration in CCPM scheduling by eliminating multitasking and safety time for each activity as well a...
Sumber Asli
Google Scholar
DOI
Penilaian Risiko Keterlambatan Pekerjaan Reparasi Kapal Bg. APC XVIII di PT. Gapura Shipyard
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 2
, No 3
(2023)
. In the shipbuilding industry, the repair process is a series of jobs that require a relatively short time. Delays in repairs can occur due to weak management and also caused by less than optimal empowerment of human resources. This study aims to identify the risks found in four divisions, namely the Production Division, Warehouse Division, Finance Division and Purchasing Division. The study found 31 risk events. Determining the value of each risk is carried out using the Failure Mode and Effec...
Sumber Asli
Google Scholar
DOI
Analisa Teknis dan Ekonomis Perawatan Terencana Kapal KM.Mutiara Ferindo 5 Roro 9000GT
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Vol 2
, No 3
(2023)
In this case it refers to the purpose of the content in this final project, namely by compiling a schedule for the Implementation of KM.Mutiara Ferindo 5 Ship Maintenance during the docking process at the PT.PAL Indonesia shipyard. Making a schedule includes what components are repaired when the ship is in a condition shipyard, make a ship maintenance management schedule that has been carried out in the shipyard. The data used in this thesis are data from PT.Antosim Lampung Pelayaran Surabaya an...
Sumber Asli
Google Scholar
DOI