ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN METODE MATERIAL REQUIREMENT PERIOD PADA PERUSAHAAN BATIK CV CEMPAKA DI SURAKARTA
đ Abstract
inventories at the Batik Company CV Cempaka, this was indicated by the total cost of raw material inventory using the economic order quantity (EOQ) technique of Rp 5,027,000, the total inventory cost raw materials use the period order quantity (POQ) method of Rp. 18,980,800, the total cost of raw material inventories using lot
for lot (LFL) is Rp. 17,500,000, and the total cost of inventory for the company's method raw materials is Rp. 27,571,000. From this comparison it can be seen that both MRP techniques namely economic order quantity (EOQ) with a total inventory cost of Rp 5,027,000 is the most optimal in order to achieve optimal optimization of the total cost of raw material inventory because it can save raw material inventory costs by 70%, so the hypothesis 2 which states that: "It is suspected that by planning raw material inventory using the MRP method at CV Cempaka Batik Company can
optimize production costs", the truth is proven.
đ Keywords
âšī¸ Informasi Publikasi
đ HOW TO CITE
Wicaksono, Bagus; Suseno, Yohanes Djoko; Widajanti, Erni, "ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN METODE MATERIAL REQUIREMENT PERIOD PADA PERUSAHAAN BATIK CV CEMPAKA DI SURAKARTA," Jurnal Ekonomi dan Kewirausahaan, vol. 19, no. 3, Oct. 2020.