Analisis Kebutuhan Volume Pekerjaan Struktur Pelat Lantai Metode Konvensional

Jurnal Teknik Sipil
Universitas 17 Agustus 1945 (UNTAG) Semarang

๐Ÿ“„ Abstract

Floor slabs are important structural elements in building construction that function as floor coverings and withstand various loads. The purpose of this study is to identify the implementation method of the slab work and analyze the material requirements for the slab work of the Joglo Elementary School Building Construction project. This research applies quantitative research type. The volume calculation method is manual (conventional). The calculation analysis is only limited to the work of reinforcing iron, formwork, and concrete. The implementation of floor slab work in this project includes reinforcement work, formwork work, casting work, formwork demolition work, and floor slab concrete maintenance work. The reinforcement requirement for the 1st floor needs 8,551.02 kg, the second floor 17,102.04 kg, and the third floor 17,102.04 kg. The formwork requirements for the 1st floor slab amounted to 1038.34 m2, the second floor amounted to 1038.24 m2, and the third floor amounted to 1038.34 m2. The casting requirement for the 1st floor slab is 103.83 m3, the 2nd floor is 124.60 m3, and the 3rd floor is 124.60 m3.

๐Ÿ”– Keywords

#floor slab; concreting; formwork; conventional method

โ„น๏ธ Informasi Publikasi

Tanggal Publikasi
04 December 2025
Volume / Nomor / Tahun
Volume 18, Nomor 2, Tahun 2025

๐Ÿ“ HOW TO CITE

Alfianarrochmah, Ilma; Joko Herlambang, Rayfandy; Putri Deni, Delista; Kurnianingsih, Oktavia; Lautan Wijaya Nusantara, Johan, "Analisis Kebutuhan Volume Pekerjaan Struktur Pelat Lantai Metode Konvensional," Jurnal Teknik Sipil, vol. 18, no. 2, Dec. 2025.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

๐Ÿ”— Artikel Terkait dari Jurnal yang Sama

๐Ÿ“Š Statistik Sitasi Jurnal

Tren Sitasi per Tahun