Analisis Kebutuhan Modal Kerja Dan Keuntungan Kontraktor Berdasarkan Sistem Pembayaran Pada Peningkatan Struktur Jalan Kedungdung–Bringkoning Kabupaten Sampang

Jurnal Teknik Sipil
Universitas 17 Agustus 1945 (UNTAG) Semarang

📄 Abstract

The working capital of construction work contractors is very influential in expediting the implementation of construction work and being able to meet work time scheduling targets. To gain profits, contractors must be able to manage existing resources. This research aims to determine working capital needs, profits and effectiveness. This type of research uses descriptive qualitative. Research data sources were obtained from secondary data and primary data. Data collection was obtained from library observations, interviews, observations and document studies. The data analysis used is based on the MC (Montly Certificate), Termin (Termyn Payment) and Final (Turnkey Payment) payment systems with several policy options, namely Source of contractor capital, Down payment, and Bank loan. The results of the analysis obtained are, Working capital requirements based on MC with Contractor Capital Resources IDR 3,000,000,000 and profit IDR 2,245,689,086, Down Payment IDR 2,963,637,000 and profit IDR 2,245,689,086, Bank Loan IDR 5,400,000,000 and profit IDR 2,072,889,086. Working capital requirements based on Terms with Contractor Capital Source IDR 3,000,000,000 and profit IDR 2,245,689,086, Down Payment IDR 2,963,637,000 and profit IDR 2,245,689,086, Bank Loan IDR 2,800,000,000 and profit IDR 2,156,089,086 .  Working capital requirements based on End with Contractor Capital Source IDR 3,000,000,000 + Loan IDR 3,600,000,000 and profit IDR 2,130,489,086, Bank Loan IDR 6,550,000,000 and profit IDR 2,036,089,086.  The highest percentage of capital effectiveness and profits is the Termin payment system with the bank loan option, 77%.

🔖 Keywords

#MC (Montly Certificate) #Term (Termyn Payment) and Final (Turnkey Payment) #Source of Contractor Capital #Down Payment #Bank Loan.

ℹ️ Informasi Publikasi

Tanggal Publikasi
29 December 2024
Volume / Nomor / Tahun
Volume 17, Nomor 2, Tahun 2024

📝 HOW TO CITE

Zabadi, Fairus; Yuwana, Wahyu, "Analisis Kebutuhan Modal Kerja Dan Keuntungan Kontraktor Berdasarkan Sistem Pembayaran Pada Peningkatan Struktur Jalan Kedungdung–Bringkoning Kabupaten Sampang," Jurnal Teknik Sipil, vol. 17, no. 2, Dec. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun