📅 10 October 2016

PENJADWALAN TENAGA KERJA HSE MENGGUNAKAN METODE MONROE DI SUMUR EKSPLORASI TAMBUN PT PERTAMINA EP

Gaung Informatika
Universitas Sahid Surakarta

📄 Abstract

PT Pertamina EP is a company engaged in the exploration, exploitation and sale of oil and gas products. PT Pertamina EP assigns HSE Coordinators and HSE Coach to carry out safety supervision in every drilling activity. However, scheduling  carried out previously by the company is considered unfair because there are still many workers whose working days exceed 2 weeks. So that the calculation is done using the Monroe method. Where previously at each location the workforce needs were 3 people each month, after calculation using the Monroe method it was found that each location needed a workforce of 6 people. So that each worker gets 2 weeks of work and time off in sequence so that the drilling process can be monitored continuously.

🔖 Keywords

#Scheduling; labor; Monroe method; exploration

â„šī¸ Informasi Publikasi

Tanggal Publikasi
10 October 2016
Volume / Nomor / Tahun
Volume 9, Nomor 3, Tahun 2016

📝 HOW TO CITE

Lubis, Antoni; Pardede, Nelson, "PENJADWALAN TENAGA KERJA HSE MENGGUNAKAN METODE MONROE DI SUMUR EKSPLORASI TAMBUN PT PERTAMINA EP," Gaung Informatika, vol. 9, no. 3, Oct. 2016.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun